AC Smart Charging
For Every Space

IoT-enabled AC charging deployments from 3.3kW to 22kW — smart, silent, and always ready across homes, societies, offices, and public spaces.

0+
Sites Live
0kW
Max Output
IoT
All Units
OCPP
2.0 Ready
// technology_stack[]

Built on Enterprise-Grade Technology

Type 2 + Bharat AC Dual Connector

Every unit ships with both Type 2 international and Bharat AC connectors — covering every passenger EV sold in India without an adaptor.

Smart Load Management

Automatically scales each charger's output based on real-time building load so you never trip a breaker, even during evening peak hours.

Individual Metering Per Outlet

Tamper-proof energy meters on every port — residents or tenants are billed only for exactly what they consume, eliminating disputes.

App + RFID Dual Access

Residents access via QR code or mobile app; corporates use RFID cards. Both methods log every session to a cloud audit trail.

Solar-Ready Architecture

AC chargers can be configured to draw from rooftop solar first, grid second — reducing per-kWh cost and supporting net-zero goals.

Remote Diagnostics & Alerts

Every fault, connectivity drop, or power anomaly is flagged in real time on the operator dashboard and escalated to our NOC automatically.

// all_projects[]

Projects in This Category

Noida Smart Society Charger
Residential
7.4 kW·2024

Noida Smart Society Charger

30-point 7.4kW AC charging installation across basement parking of a 500-unit gated society in Sector 62.

Sector 62, Noida
30 charging pointsIndividual billing per flat
Cyber City EV Charging Hub
Commercial
22 kW·2023

Cyber City EV Charging Hub

White-label 22kW AC charging installation across Cyber City's multi-level parking serving 200+ daily corporate EV users.

DLF Cyber City, Gurugram
22kW 3-Phase unitsWhite-label branding
Dwarka AC Charging Point
Residential
7.4 kW·2023

Dwarka AC Charging Point

Community-level 7.4kW AC charger deployment serving residents of a housing cooperative in Dwarka.

Dwarka Sec-12, New Delhi
7.4kW AC unitsPay-as-you-go billing
Ghaziabad Residential EV Hub
Residential
11 kW·2024

Ghaziabad Residential EV Hub

11kW 3-phase AC chargers installed across a premium township's visitor and resident parking with automated time-slot booking.

Indirapuram, Ghaziabad
11kW 3-PhaseTime-slot booking
Noida Sector 125 Charging Hub
Commercial
22 kW·2024

Noida Sector 125 Charging Hub

22kW high-power AC installation at an IT park serving fleet vehicles and employee EVs with dynamic load balancing.

Sector 125, Noida
22kW fleet-gradeDynamic load balancing
Shimla AC Charging Station
Public
7.4 kW·2024

Shimla AC Charging Station

Tourist-facing 7.4kW AC public charger at Shimla's main parking area serving the growing EV tourism segment in the hills.

Shimla, Himachal Pradesh
Tourist-facingQR code payment
// deployment_process[]

From Site Visit to Go-Live in Days

01

Site Survey & Assessment

Our engineers visit the site to evaluate power availability, civil requirements, and optimal charger placement. A detailed feasibility report is shared within 48 hours.

02

Design & DISCOM Approval

We prepare the single-line diagram, load enhancement application, and municipal permits. EarthTronEV handles all government filings on your behalf.

03

Installation & Commissioning

Certified electricians complete civil work, cable laying, and hardware installation. Each unit is tested and commissioned against OCPP 2.0 certification criteria.

04

Go-Live & 24/7 Support

Chargers go live on the EarthTronEV cloud platform. Staff training, user onboarding, and remote monitoring begin immediately — with a guaranteed uptime SLA.

// why_earthtronev

Our Commitment to Every Deployment

OCPP 2.0 Enabled
Remote management ready
BIS + ARAI Certified
India regulatory standards
99.5% Uptime SLA
Guaranteed by contract
Pan-India Coverage
NCR, Tier-2 & beyond
4-Hour On-Site SLA
For critical faults
OEM Warranty
3-year hardware warranty
// use_cases[]

Where We Deploy This Solution

Every deployment is tailored to the specific use case — site requirements, user behaviour, and operator business model are all factored into the design.

Gated Societies & Apartments

Per-flat billing, resident mobile app, and load management — turning shared basement parking into a smart charging network.

Start a Project

Corporate Campuses & IT Parks

Employee EV charging during office hours using surplus daytime solar — deployed as an HR benefit or a cost-recovery service.

Start a Project

Hotels & Hospitality

Premium AC charging as a guest amenity: welcome screen, brand logo on charger, and a revenue line from EV visitors.

Start a Project

Public Parking & Town Centres

Pay-per-kWh public AC chargers with QR code payment — no app download required, maximising accessibility for all EV users.

Start a Project
// frequently_asked[]

Common Questions

Answers to the questions we hear most often from site owners, facility managers, and fleet operators.

7.4kW is single-phase and adds about 50 km of range per hour — suitable for overnight home charging. 22kW is 3-phase and adds ~120 km/hr, ideal for corporate or public use where vehicles stay for 2–4 hours.

Single-phase 7.4kW units often can, subject to a load study. Three-phase 22kW units require dedicated cabling and a load assessment of the distribution board.

Each charger has an individual revenue-grade meter. Residents pay via app; the society receives a consolidated monthly reconciliation report and payment.

Yes. EarthTronEV can own and operate the chargers under a revenue-sharing agreement — no upfront cost for the society. We install, maintain, and bill users directly.

Sessions terminate safely on power loss. On restoration, the charger resumes in standby and the user is notified via app to re-authenticate for a new session.

// start_your_project()

Install Smart AC Charging at Your Site

From a single home charger to a 100-bay society installation — design your AC project with EarthTronEV.

BIS Certified HardwareOCPP 2.0 Compliant3-Year OEM Warranty24/7 Remote Monitoring