AC Smart Charging
For Every Space
IoT-enabled AC charging deployments from 3.3kW to 22kW — smart, silent, and always ready across homes, societies, offices, and public spaces.
Built on Enterprise-Grade Technology
Type 2 + Bharat AC Dual Connector
Every unit ships with both Type 2 international and Bharat AC connectors — covering every passenger EV sold in India without an adaptor.
Smart Load Management
Automatically scales each charger's output based on real-time building load so you never trip a breaker, even during evening peak hours.
Individual Metering Per Outlet
Tamper-proof energy meters on every port — residents or tenants are billed only for exactly what they consume, eliminating disputes.
App + RFID Dual Access
Residents access via QR code or mobile app; corporates use RFID cards. Both methods log every session to a cloud audit trail.
Solar-Ready Architecture
AC chargers can be configured to draw from rooftop solar first, grid second — reducing per-kWh cost and supporting net-zero goals.
Remote Diagnostics & Alerts
Every fault, connectivity drop, or power anomaly is flagged in real time on the operator dashboard and escalated to our NOC automatically.
Projects in This Category

Noida Smart Society Charger
30-point 7.4kW AC charging installation across basement parking of a 500-unit gated society in Sector 62.

Cyber City EV Charging Hub
White-label 22kW AC charging installation across Cyber City's multi-level parking serving 200+ daily corporate EV users.

Dwarka AC Charging Point
Community-level 7.4kW AC charger deployment serving residents of a housing cooperative in Dwarka.

Ghaziabad Residential EV Hub
11kW 3-phase AC chargers installed across a premium township's visitor and resident parking with automated time-slot booking.

Noida Sector 125 Charging Hub
22kW high-power AC installation at an IT park serving fleet vehicles and employee EVs with dynamic load balancing.

Shimla AC Charging Station
Tourist-facing 7.4kW AC public charger at Shimla's main parking area serving the growing EV tourism segment in the hills.
From Site Visit to Go-Live in Days
Site Survey & Assessment
Our engineers visit the site to evaluate power availability, civil requirements, and optimal charger placement. A detailed feasibility report is shared within 48 hours.
Design & DISCOM Approval
We prepare the single-line diagram, load enhancement application, and municipal permits. EarthTronEV handles all government filings on your behalf.
Installation & Commissioning
Certified electricians complete civil work, cable laying, and hardware installation. Each unit is tested and commissioned against OCPP 2.0 certification criteria.
Go-Live & 24/7 Support
Chargers go live on the EarthTronEV cloud platform. Staff training, user onboarding, and remote monitoring begin immediately — with a guaranteed uptime SLA.
Our Commitment to Every Deployment
Where We Deploy This Solution
Every deployment is tailored to the specific use case — site requirements, user behaviour, and operator business model are all factored into the design.
Gated Societies & Apartments
Per-flat billing, resident mobile app, and load management — turning shared basement parking into a smart charging network.
Start a ProjectCorporate Campuses & IT Parks
Employee EV charging during office hours using surplus daytime solar — deployed as an HR benefit or a cost-recovery service.
Start a ProjectHotels & Hospitality
Premium AC charging as a guest amenity: welcome screen, brand logo on charger, and a revenue line from EV visitors.
Start a ProjectPublic Parking & Town Centres
Pay-per-kWh public AC chargers with QR code payment — no app download required, maximising accessibility for all EV users.
Start a ProjectCommon Questions
Answers to the questions we hear most often from site owners, facility managers, and fleet operators.
7.4kW is single-phase and adds about 50 km of range per hour — suitable for overnight home charging. 22kW is 3-phase and adds ~120 km/hr, ideal for corporate or public use where vehicles stay for 2–4 hours.
Single-phase 7.4kW units often can, subject to a load study. Three-phase 22kW units require dedicated cabling and a load assessment of the distribution board.
Each charger has an individual revenue-grade meter. Residents pay via app; the society receives a consolidated monthly reconciliation report and payment.
Yes. EarthTronEV can own and operate the chargers under a revenue-sharing agreement — no upfront cost for the society. We install, maintain, and bill users directly.
Sessions terminate safely on power loss. On restoration, the charger resumes in standby and the user is notified via app to re-authenticate for a new session.
Install Smart AC Charging at Your Site
From a single home charger to a 100-bay society installation — design your AC project with EarthTronEV.