// RESIDENTIAL.projects[]

Residential EV
Charging Solutions

Smart charging for apartments, gated societies, and housing townships — with individual billing, load management, and app control built in.

0+
Units Installed
0+
Societies
0%
App Controlled
0
Billing Disputes
// technology_stack[]

Built on Enterprise-Grade Technology

Zero Capex for Societies

EarthTronEV installs and owns the chargers under a revenue-share model — the society pays nothing upfront, we recover cost from per-kWh charges.

Resident Mobile App

Each resident gets a dedicated app to schedule charging slots, view consumption, pay bills, and raise service requests — all in one place.

Automated Tamper-Proof Billing

Revenue-grade individual energy meters on every charger ensure residents are billed only for actual consumption, with no manual readings or disputes.

Society Analytics Dashboard

The RWA/management committee gets a live dashboard: total energy consumed, peak hours, revenue collected, and charger health status.

Slot Booking & Queue Management

Residents book charging slots up to 24 hours in advance; smart queue management ensures no charger sits idle while others wait.

Solar Integration Ready

Chargers can be connected to the society's rooftop solar plant — residents charging during daytime get lower per-kWh rates from solar.

// all_projects[]

Projects in This Category

Noida Smart Society Charger
Society
7.4 kW·2024

Noida Smart Society Charger

30-bay 7.4kW EV charging installation across basement parking of a 500-unit gated society with per-flat billing.

Sector 62, Noida
30 charging baysPer-flat billing
Dwarka Residential Hub
Apartment
7.4 kW·2023

Dwarka Residential Hub

16-point apartment-complex installation in Dwarka with individually metered 7.4kW chargers and mobile-app scheduling.

Dwarka Sec-12, New Delhi
16-point installationMobile-app scheduling
Ghaziabad Residential EV Hub
Township
11 kW·2024

Ghaziabad Residential EV Hub

Premium township deployment of 11kW 3-phase AC chargers across three parking blocks with automated time-slot booking.

Indirapuram, Ghaziabad
3-Phase 11kW unitsTime-slot booking
Gurugram Society EV Station
Society
7.4 kW·2024

Gurugram Society EV Station

20-bay charging network at a luxury society in Gurugram with white-label branding and resident-only RFID access.

Sector 56, Gurugram
20-bay networkWhite-label branding
// deployment_process[]

From Site Visit to Go-Live in Days

01

Site Survey & Assessment

Our engineers visit the site to evaluate power availability, civil requirements, and optimal charger placement. A detailed feasibility report is shared within 48 hours.

02

Design & DISCOM Approval

We prepare the single-line diagram, load enhancement application, and municipal permits. EarthTronEV handles all government filings on your behalf.

03

Installation & Commissioning

Certified electricians complete civil work, cable laying, and hardware installation. Each unit is tested and commissioned against OCPP 2.0 certification criteria.

04

Go-Live & 24/7 Support

Chargers go live on the EarthTronEV cloud platform. Staff training, user onboarding, and remote monitoring begin immediately — with a guaranteed uptime SLA.

// why_earthtronev

Our Commitment to Every Deployment

OCPP 2.0 Enabled
Remote management ready
BIS + ARAI Certified
India regulatory standards
99.5% Uptime SLA
Guaranteed by contract
Pan-India Coverage
NCR, Tier-2 & beyond
4-Hour On-Site SLA
For critical faults
OEM Warranty
3-year hardware warranty
// use_cases[]

Where We Deploy This Solution

Every deployment is tailored to the specific use case — site requirements, user behaviour, and operator business model are all factored into the design.

High-Rise Apartments

Designated bay chargers for each flat in basement parking — resident-only RFID access, individual billing, and app-based monitoring.

Start a Project

Gated Communities & Villas

Shared fast charger at the community gate plus individual home chargers for villa residents, all managed from one cloud platform.

Start a Project

Builder Projects & New Developments

Pre-wired EV charging bays included in the project — EarthTronEV partners with builders at the design stage for zero-rework deployment.

Start a Project

Housing Cooperatives & RWA Societies

Single RWA agreement covers all residents; EarthTronEV handles installation, operations, billing, and maintenance permanently.

Start a Project
// frequently_asked[]

Common Questions

Answers to the questions we hear most often from site owners, facility managers, and fleet operators.

Under our zero-capex model, EarthTronEV bears the full hardware and installation cost. Residents pay only for energy consumed at transparent per-kWh rates.

Yes. Our slot booking system manages shared chargers fairly — residents book in advance and receive app notifications when their slot is active.

The charger stays with the parking bay. The new owner registers on the app and gets full access without any new installation or hardware change.

Yes, RWA resolution is required. Our team assists with the RWA presentation, approval paperwork, and all DISCOM/municipal permits.

7.4kW single-phase is ideal for most passenger EVs charged overnight (adds ~50km/hr). For high-mileage users (80+ km/day), 11kW 3-phase is recommended.

Each charger has a revenue-grade sub-meter tied to the resident's app account. Consumption is billed per-kWh directly to the resident — the society's common electricity bill is unaffected.

Our CSMS platform detects faults in real time and alerts our NOC automatically. A technician is dispatched under our maintenance SLA, typically within 24-48 hours.

Yes. The installation is designed to scale — additional charging bays can be added incrementally without re-doing existing wiring or infrastructure.

// start_your_project()

Electrify Your Society

Zero upfront cost for societies — EarthTronEV installs, operates, and maintains. You earn per charge.

BIS Certified HardwareOCPP 2.0 Compliant3-Year OEM Warranty24/7 Remote Monitoring