DC Fast Charging
Across India
High-power DC fast charging deployments from 40kW to 480kW — enabling rapid, reliable EV charging at highways, fuel stations, and urban hubs.
Built on Enterprise-Grade Technology
CCS2 + CHAdeMO Multi-Standard
Every EarthTronEV DC unit supports all major connector standards — CCS2, CHAdeMO, and GB/T — so no EV is ever turned away.
Dynamic Load Balancing
Intelligent power distribution across multiple dispensers prevents grid overload and maximises simultaneous charge sessions at peak hours.
Remote OTA Firmware Updates
Firmware pushed over-the-air to every deployed unit — zero downtime, zero on-site visits for software maintenance or security patches.
Real-Time Revenue Reporting
Charge logs, revenue breakdowns, peak utilisation graphs, and fault history available on the cloud dashboard 24/7 for operators.
OCPP 2.0 Native
Full OCPP 2.0 compliance enables integration with any CSMS, fleet management platform, or third-party EV roaming network out of the box.
IP55 All-Weather Rated
Ruggedised enclosures rated for Indian conditions — monsoon rains, 50°C summer heat, and dusty highways — without performance degradation.
Projects in This Category

Delhi Expressway Charging Hub
India's largest highway charging hub on NH-44, featuring 240kW DC dispensers with CCS2 connectors for passenger and commercial EVs.

South Delhi Fast Charging Point
Premium 60kW fast charging installation in South Delhi serving daily commuters and ride-sharing fleets.

Faridabad DC Fast Charger
Strategically placed 120kW charger on NH-19 serving intercity EV travellers between Delhi and Agra.

Rohtak Highway Charging Point
80kW highway charging point on NH-9 connecting Rohtak to Delhi, enabling emission-free freight corridor.

Ghaziabad Highway EV Point
Twin 120kW DC chargers at the Ghaziabad highway interchange enabling fast turnaround for passenger EVs.

Dwarka EV Charging Station
Urban 60kW DC station serving Dwarka's growing EV community and metro commuters.
From Site Visit to Go-Live in Days
Site Survey & Assessment
Our engineers visit the site to evaluate power availability, civil requirements, and optimal charger placement. A detailed feasibility report is shared within 48 hours.
Design & DISCOM Approval
We prepare the single-line diagram, load enhancement application, and municipal permits. EarthTronEV handles all government filings on your behalf.
Installation & Commissioning
Certified electricians complete civil work, cable laying, and hardware installation. Each unit is tested and commissioned against OCPP 2.0 certification criteria.
Go-Live & 24/7 Support
Chargers go live on the EarthTronEV cloud platform. Staff training, user onboarding, and remote monitoring begin immediately — with a guaranteed uptime SLA.
Our Commitment to Every Deployment
Where We Deploy This Solution
Every deployment is tailored to the specific use case — site requirements, user behaviour, and operator business model are all factored into the design.
National Highway Corridors
Enable long-distance EV travel by deploying 120–240kW dispensers every 80–100km along major NH routes, matching petrol station density.
Start a ProjectFuel Station Retrofits
Transform existing petrol pumps into EV-ready hubs with minimal civil work — add 2–4 DC bays without disrupting petrol/diesel operations.
Start a ProjectUrban Commercial Hubs
Malls, hotels, and office towers: EV visitors charge in 30 minutes during their visit, improving dwell time and generating ancillary revenue.
Start a ProjectFleet & Logistics Depots
High-throughput depot charging for taxi fleets, app-based cab aggregators, and last-mile delivery operators with shift-based scheduling.
Start a ProjectCommon Questions
Answers to the questions we hear most often from site owners, facility managers, and fleet operators.
Typically 3–5 days from site readiness — this includes civil work, electrical connection, network commissioning, and a final certification check.
A 3-phase supply with minimum 100A at 415V for a 40kW unit. Higher outputs (120kW+) require a dedicated LT/HT transformer — we assist with DISCOM coordination.
Yes. All stations are monitored remotely round the clock. On-site SLA is within 4 hours for critical faults and 24 hours for minor issues.
Absolutely. OCPP 2.0 support means seamless integration with platforms like Charge Point, Greenlabs, or any custom fleet system via standard API.
Yes, mandatory for all DC fast chargers sold or deployed in India. Every EarthTronEV unit carries valid BIS and ARAI certification.
Deploy DC Fast Charging at Your Site
From a single 40kW rapid charger to a 480kW highway dispenser — plan your DC project with EarthTronEV.